Explore

Clear

50+ locality groups

Locality CC Occurrences Suggestions Validated Status
Approach 2 (Just Outside reef): This approach was carried out to collect fish samples just ourside reef areas. In this aproach , three portable traps of 4.5 ft long and 3.5 ft width were deployed at each station with scads were used as bait. At each secti
13 Needs georeferencing Georeference →
ORI net; wire out: S(12) m; towing duration: 30 min.; wire angle: 50 deg.
13 Needs georeferencing Georeference →
4m hexagonal net; step tow; wire out: 500, 250, 125 m; towing duration: 20, 20, 20 min.; wire angle: 62 deg., 50 deg., 69 deg.
13 Needs georeferencing Georeference →
4 m hexagon net; wire out: 30 m; towing duration: 30 min.; wire angle: 70 deg.; ship speed: 1.5 kts.
13 Needs georeferencing Georeference →
ORI net; wire out: 30 m; towing duration: 30 min.; wire angle: 50 deg.; ship speed: 1.5 kts.
13 Needs georeferencing Georeference →
two neuston tows (once during darkness and once during daylight) using David-Hempel type equipped with two nets (mesh size: 500 m, net opening: 30 cm wide and 15 cm high)
13 Needs georeferencing Georeference →
IKPT net; mesh size: 1.0 mm; oblique tow; wire out: 366 m
12 Needs georeferencing Georeference →
ORI net; wire out: 75 m; towing duration: 30 min.; wire angle: 47 deg.
12 Needs georeferencing Georeference →
ORI net; wire out: 150, 75, S(25) m; towing duration: 10, 10, 10 min.; wire angle: 64 deg., 45 deg., 67 deg.
12 Needs georeferencing Georeference →
ORI net; wire out: 75 m; towing duration: 30 min.; wire angle: 30 deg.
12 Needs georeferencing Georeference →
1.6 meter ORI-net; wire out: 2000 m; ship speed: 2.0 kts.
12 Needs georeferencing Georeference →
Beam trawl
12 Needs georeferencing Georeference →
1.6 m net; wire out: 150 m; towing duration: 30 min.; wire angle: 71 deg.; ship speed: 1.5 kts.
12 Needs georeferencing Georeference →
1.3 meter larva net; wire out: 0 m.
12 Needs georeferencing Georeference →
a series of oblique tows using a 10-foot IKMT (wire out: 5000 m)
12 Needs georeferencing Georeference →
ORI-69 net (wire out: 150 m)
12 Needs georeferencing Georeference →
4m hexagonal net; wire out length: 30 m; towing duration: 30 m; wire angle: 61 deg.; night time sampling
12 Needs georeferencing Georeference →
4m hexagonal net; wire out length: 75m; towing duration: 30 min.; wire angle: 63 deg.; night time sampling
12 Needs georeferencing Georeference →
4m round net; wire out: S(35) m; towing duration: 30 min.; wire angle: 74 deg.
12 Needs georeferencing Georeference →
4m round net; wire out: 75 m; towing duration: 30 min.; wire angle: 79 deg.
12 Needs georeferencing Georeference →
4m round net; wire out: 75 m; towing duration: 30 min.; wire angle: 59 deg.
12 Needs georeferencing Georeference →
Two consecutive oblique tows using a 3 m IKMT (0.5 mm Nitrex netting, 8.7 m^2 mouth area) or two repeated horizontal tows at sea surface using ORI Net (0.66 mm mesh, 2.0 m^2 at mouth)
12 Needs georeferencing Georeference →
4m round net; wire out: 75 m; towing duration: 30 min.; wire angle: 78 deg.
12 Needs georeferencing Georeference →
scuba diving and underwater photographs using Nikon RS underwater camera
12 Needs georeferencing Georeference →
4m hexagonal net; wire out: S(25) m; towing duration: 30 min.; wire angle: 82 deg.
12 Needs georeferencing Georeference →
4m round net; wire out: 150, 75, S(30) m; towing duration: 10, 10, 10 min.; wire angle: 62 deg., 57 deg., 60 deg.
12 Needs georeferencing Georeference →
ORI net; wire out: 30 m; towing duration: 30 min.; wire angle: 72 deg.; ship speed: 1.5 kts.
12 Needs georeferencing Georeference →
ORI net; wire out: 30 m; towing duration: 30 min.; wire angle: 65 deg.; ship speed: 1.5 kts.
12 Needs georeferencing Georeference →
IKPT net; mesh size: 1.0 mm; oblique tow; wire out: 367 m
12 Needs georeferencing Georeference →
ORI net; wire out: S(17); towing duration: 30 min.; wire angle: 45 deg.
12 Needs georeferencing Georeference →
gill net (trammel net, ca. 9 cm mesh, amilan, ca. 7,000 m^2)
12 Needs georeferencing Georeference →
horizontal towing with IKMT net (-200 m)
12 Needs georeferencing Georeference →
two repeated oblique tows by IKPT
12 Needs georeferencing Georeference →
littoral collecting
12 Needs georeferencing Georeference →
Scuba diving. The living posture and substratum were observed and photo-recorded in situ with a Nikon RS underwater camera. Some specimens were collected and preserved in 70% ethanol.
12 Needs georeferencing Georeference →
The plants were collected from 0.25 m*0.25 m quadrats along six line transects during the lowest daytime spring tide. These line transects were laid perpendicular to the shoreline, each 100 m apart. Ten quadrat samples were placed at ten meter intervals a
12 Needs georeferencing Georeference →
large 4 meter hexagon-net; wire out: 30 m; towing duration: 30 m; wire angle: 63 deg.; ship speed: 1.5 kts.
11 Needs georeferencing Georeference →
large 4 meter hexagon-net; wire out: 30 m; towing duration: 30 m; wire angle: 71 deg.; ship speed: 1.5 kts.
11 Needs georeferencing Georeference →
large 4 meter hexagon-net; wire out: 30 m; towing duration: 30 m; wire angle: 70 deg.; ship speed: 1.5 kts.
11 Needs georeferencing Georeference →
Gamo's net: a small conical plankton nets attached to the inside of the 4 m ORE Beam Trawl nets in order to retain smaller organisms; 7300 m wire out
11 Needs georeferencing Georeference →
large 4 meter hexagon-net; wire out: 75 m; towing duration: 30 m; wire angle: 75 deg.; ship speed: 1.5 kts.
11 Needs georeferencing Georeference →
1.6 m net; wire out: 75 m; towing duration: 30 min.; wire angle: 69 deg.; ship speed: 1.5 kts.
11 Needs georeferencing Georeference →
4m ORE Beam Trawl and Gamo's net: a small conical plankton nets attached to the inside of the trawl nets in order to retain smaller organisms; 2500 m wire out
11 Needs georeferencing Georeference →
IKPT net; mesh size: 1 mm; horizontal tow
11 Needs georeferencing Georeference →
4m round net; wire out length: 75m; towing duration: 30 min.; wire angle: 70 deg.; night time sampling
11 Needs georeferencing Georeference →
4m hexagonal net; wire out length: 30 m; towing duration: 30 min.; wire angle: 62 deg.; night time sampling
11 Needs georeferencing Georeference →
4m hexagonal net; wire out length: 30 m; towing duration: 30 min.; wire angle: 61 deg.; night time sampling
11 Needs georeferencing Georeference →
4m round net; wire out: S(40) m; towing duration: 30 min.; wire angle: 64 deg.
11 Needs georeferencing Georeference →
4m round net; wire out: 30 m; towing duration: 30 min.; wire angle: 72 deg.
11 Needs georeferencing Georeference →
4m round net; wire out: S(35) m; towing duration: 30 min.; wire angle: 76 deg.
11 Needs georeferencing Georeference →